SINGAPORE · INDONESIA · INDIA · MYANMAR · KAZAKHSTAN · MALAYSIA · THAILAND · VIETNAM · CHINA

Past Project 2024

Penta-Bachy Joint Venture – N105 Project, North South Corridor

The N105 Project covers the design and construction of a section of the North South Corridor between Suffolk Walk and Novena Rise. Jenmon was engaged to supply 1 unit of a 36-ton and 1 unit of a 30-ton gantry crane, complete with runway rail and cable reel, giving the Penta-Bachy Joint Venture two cranes sized to the different lifting demands along this stretch of the corridor.