Special projects
Where standard solutions stop.

Jenmon Gantry Cranes for SMRT sleeper replacement
ClientGammon Construction · LTA SMRT
Many have come across the gigantic Gantry Cranes standing in the midst of the trail along East-West Line (EWL) between Chinese Garden and Lakeside stations, and North-South Line (NSL) at Pasir Ris station. These 2 Jenmon fixed Gantry Cranes were deployed to speed up the works along the tracks, including the replacement of rail sleepers.
As this project is the first of its kind in Singapore, it is considered quite new. It was awarded to Gammon Construction Pte Ltd, which is a subsidiary company of Gammon.
40 ton Gantry cranes
This firm mainly contributes to Singapore's infrastructure, including the completion of many contracts for Land Transport Authority (LTA), as well as several major projects in the commercial and petrochemical sectors.

Facilitating Ramp Construction with Jenmon Gantry Crane
ClientJurong Primewide · LTA Tuas West MRT Extension Depot
LTA awarded the construction of Tuas West MRT Extension Depot to Jurong Primewide Pte Ltd. This involved the construction of a 26-hectare depot, which will be an extension of the East-West Line from Joo Koon station.
Jurong Primewide had extensive experience in building and civil engineering works, having worked on several projects in Singapore and internationally.
Jenmon was then awarded by Jurong Primewide Pte Ltd to design, supply, deliver, install, test and commission 1 unit of 40 ton Double Girder Gantry Crane.
Along with the depot, an area was designated for a bus terminal, which took up approximately 10,000 sq metres. It was to be primarily accessible via a ramp structure, connecting directly to Tuas West Drive. Alternatively, the site could also be accessible via another ramp structure connecting to Tuas Link 4. Both ramps…

Synchronised cranes for the CLB project
ClientCLB Project
BAM International is a subsidiary of Royal BAM Group, one of Europe's largest contracting companies with extensive international experience. Their cantilever bridge was undergoing modification in Batam, Indonesia, in preparation for the largest oil and gas project in Darwin, Australia's Northern Territory. Part of the innovation included gantry cranes, which were capable of transporting larg…

Batam cantilever bridge — tight-headroom vessel install
ClientMarine · Batam
One of the leading global contractors specialises in seabed-to-surface engineering, construction and services to the offshore energy industry worldwide. To match the evolving needs of deep-water subsea developments, Subsea 7 promises to set a new benchmark in the subsea world with the state-of-art strategic enabler – Seven Borealis, DP pipe lay and Heavy Lift Construction Vessel…
Active register · 2026
Currently delivering.

5T retractable monorail · RTS Link Woodlands North CIQ
ClientPenta-Ocean Construction Pte Ltd
Supply and installation of a 5-tonne retractable beam monorail with motorised hoist, PE-endorsed civil design, and boom-lift erection for the Johor Bahru–Singapore RTS Link.
10T wire-rope hoist monorail · 10m span · 16m hook height
ClientPenta-Ocean Construction Pte Ltd
Second monorail crane system awarded — 10T wire-rope hoist on fixed beam crane and support structure, with lifting lug supply and PE endorsement.
Senoko factory · 3 × 10T overhead cranes
ClientLian Beng Group
Additional contract following the 2025 delivery of 7 cranes with magnetic systems. Three new 10T overhead cranes for production efficiency at Senoko.
Multiple defence installations (confidential)
ClientDSTA
Jenmon has been awarded several DSTA projects. Due to the highly confidential nature of these installations, project details are not publicly disclosed.
Crane modification & shifting programme
ClientJumbo Industries
Modification and site shifting of existing crane systems at the Jumbo industrial premises.
Selected past projects
A decade of delivery.
Selected past projects from 2010 through 2021 — across LTA tunnel contracts, HDB civil works, PUB infrastructure, PSA marine and manufacturing sites.
JRL J108 · J106
John Holland–McConnell Dowell JV / China Communications Construction
PSA Mega Yard Tuas F2
PSA Corporation Limited
HDB Sengkang N4 · PUB DTSS T09 · TEL T308
Chip Eng Seng / Leighton Contractors (Asia) / SsangYong–Hyundai JV
TEL T302 · T311 · Melbourne Metro · West Gate
China Railway First Group / China Jingye / Jenmon Australia
TEL T310 · Australia footprint
Woh Hup–Shanghai Tunneling Engineering JV
TEL T220 · Chinese Garden sleeper replacement · eSOS launch
Tiong Seng–Dongah Geological JV / SMRT
DTL2 C916
McConnell Dowell South East Asia
DTL3 C930
SK Engineering & Construction
Depot C981
Hitachi Plant Technologies
DTL2 C919 · C921
Sembawang Engineers / SsangYong Engineering
LTA-related jobs
Trusted on Singapore's tunnel lines.
Engineered cranes delivered across LTA Depot, Downtown Line 2, Downtown Line 3, Jurong Region Line, Thomson East Coast Line, and the Rapid Transit System.
Rapid Transit System (RTS)
1 contracts
Thomson East Coast Line (TEL)
13 contracts
Jurong Region Line (JRL)
3 contracts
Downtown Line 3 (DTL3)
5 contracts
Downtown Line 2 (DTL2)
6 contracts
Depot
1 contracts
Testimonials
What our customers say.
Commendation to Jenmon for Quality Product and Professionalism
I would like to commend on Jenmon for meeting all our expectations and the crane works well for our applications.
We have a unique application of handling heavy containers for maintenance. Jenmon listen and based on our needs, designed and developed a solution so we can carry out our applications smoothly, improving productivity for the company.
Throughout the project, Jenmon team has shown professionalism and commitment.
Keep up the good work!
An impressive job at Rochor Canal Road C921
Jenmon International did a phenomenal job for us at Rochor Canal Road. We were impressed with Jenmon from our first engagement with them, all the way till the completion of our crane.
In 2011, we appointed JENMON as the supplier of our engineered crane for C921 of LTA-DTL Project. Despite the tight schedule, our site was not ready to provide detailed technical information on the 35T Double Girder Engineered crane due to the nature of the contract ‘Design & Build’. However, Mr. Mark Ong personally made several trips to discuss on a solution together with our team to avoid any slippage to the project delivery.
During the crane erection phase, several challenges arise. One of them being space constraint at the installation area. However, Jenmon was able to propose an excellent lifting plan, convinced us with a safe work procedure and finally, proceeded with the installation of our crane in a safe and orderly manner.
Our entire experience with Jenmon was satisfactory, and they met our expectations sufficiently. We are impressed with the know-how of the team, and their 24-hour after-sales service has been prompt to our calls for assistance.
Selected customers list
Trusted by global players.
Jenmon's rapport with major players in the industries of Aerospace, Entertainment, Construction, Oil & Gas, Healthcare and Marine has been the reason why we are able to build new relationships in these markets.