POKB JV – DTSS T08 Project
Awarded by Penta-Ocean Construction Co., Ltd. and Koh Brothers Joint Venture for 1 unit of 35 ton Gantry Crane and 3 units of 20 ton Gantry Cranes for Public Utilities Board (PUB) for Deep Tunnel Sewerage System (DTSS) Phase 2
Awarded by Penta-Ocean Construction Co., Ltd. and Koh Brothers Joint Venture for 1 unit of 35 ton Gantry Crane and 3 units of 20 ton Gantry Cranes for Public Utilities Board (PUB) for Deep Tunnel Sewerage System (DTSS) Phase 2 Project – Contract T-08
The Public Utilities Board (PUB) awarded the construction of the Deep Tunnel Sewerage System (DTSS) Phase 2 T-08 to Penta-Ocean and Koh Brothers Joint Venture.
Jenmon was then awarded by Penta-Ocean and Koh Brothers Joint Venture to design, fabricate, supply, deliver, install, test and commission 1 unit of 35 ton Gantry Crane and 3 units of 20 ton Gantry Cranes.
With numerous working experiences with Penta Ocean and Koh Brothers, Jenmon is honoured to be awarded yet again for another project.
The 4 units of Gantry Cranes have to be engaged in deep tunnelling works, as the construction of the deep tunnel sewers will serve as a conveyer to distribute the used water to three centralised treatment plants under PUB. These gantry cranes are designed with hook height of 72m deep and high speed of 24 m/min and operated at 90% full load for the project period.
With the expertise in deep tunnelling works over the years, Jenmon provides our customer with the best possible lifting solutions.