Sato Kogyo (S) Pte Ltd – CR115, Tavistock Station and Tunnels
CR115 covers the design and construction of Tavistock Station and its tunnels. Jenmon was appointed to supply 2 units of 40-ton double girder gantry cranes, each spanning 13.2m with a 5m extension, along with runway rail and cable reel — equipping Sato Kogyo (S) Pte Ltd with matched lifting capacity for the station box works.